HVAC Solutions Around Ongoing Pharmaceutical Operations


OverVIEW

AWB Engineers upgraded the HVAC system of a fully operational pharmaceutical compounding facility without disrupting its 24/7 production. Led by Principal Engineer Pawel Szczurko, the team reinforced the interior steel structure to support new rooftop units and engineered solutions that met clean room standards for air quality, pressure control, and system reliability. Every design move was made with safety, regulatory compliance, and operational continuity throughout the project.

Industry

PHARMACEUTICAL

Service

HVAC

Building Area

100,000 sq. ft.